Tuesday, March 27, 2012

Why spend money every year to maintain your roof?

Everyday exposure to sun, rain, air conditioning repair workers, and other wear-and-tear slowly ages your roof membrane until its service life ends. Every extra year you can eke out of the roof is that much more money that can be saved for other expenditures. A roof doesn't need food and exercise, but it does need regular check-up's in the form of regular inspections and prompt repairs.
What benefit is there in spending money every year to maintain the roof? Studies have shown that a roofs not regularly maintained will only last about half of their expected service life. You might say "That's why I have a warranty.", but don't assume that a warranty will help. Almost all manufacturers of roofing materials state specifically in their warranty that your warranty is void if the roof is not maintained. If you can not show that the roof has been properly and andequately maintained, you will not have a case when you try to make a claim on a warranty issue.
Your roof should be inspected at least twice a year to keep the roof alive as long as possible and to maintain your warranty. Depending on the depth and complexity of the inspection, the inspector can be the building staff, an architect or engineer who specializes in roof consulting, or a competent roofing contractor. The inspection can entail anything from looking at the roof while walking to repair an A/C unit, all the way to a formal inspection with a moisture survey.
Find a Contractor here
ROOFING CONTRACTORS NEEDED IN MULTIPLE STATES!
Patton Services | (309) 303-3128 | rpatton55@comcast.net | http://www.whiteroofingsystems.com

Wednesday, February 8, 2012

Roof asset management - preventive maintenance

All roof systems have a limited lifespan and will eventually require replacement, retrofit, repair, or restoration.

Developing a preventive maintenance plan with your roofing contractor can further extend the life of a roof and save you money by correcting problems before they become major leaks that could cause real structural damage.

Over time, a Roof Asset Management Program can optimize roof performance, save you money, and allow for roof replacement or repairs to be performed on a planned basis - not in reaction to a crisis.

If your roof is new and has been inspected by a roof consultant throughout construction, the final inspection report should provide enough information to establish a maintenance plan and inspection timetable.

For existing roofs, a roof consultant or qualified roofing contractor should thoroughly inspect the roof and provide a written report of findings with a photo survey of roof conditions for your future reference. Based on those findings, work with the roof consultant or roofing contractor to develop projected life-cycle budget cost estimates and establish plans for upcoming maintenance, replacement, or repair.

A good roof-management program should include annual inspections to look for damages - including membrane deterioration, water blisters, ponding water areas, coping impact damage, rusting metal, spray foam oxidation, membrane splits, etc.

If your roof shows signs of deterioration, moisture testing may be recommended:
  • Moisture probes are used to check distressed areas for the presence of moisture by probing through the roof surface and taking readings from the moisture meter.
  • Infrared scans are infrared snapshots of a roof area taken to detect the possible presence of moisture by recording temperature differentials.
  • Nuclear scans utilize a roof grid survey to detect subsurface moisture.
  • Roof core samples are an investigative hole is cut through the roof and insulation to document conditions in suspect areas (the hole is patched upon completion).
The goal of both new construction and re-roofing review and ongoing roof-management programs is to protect the interest you (the building owner or manager), to extend the life of your roof, and to prevent costly leaks and damage.


Find a Contractor here


ROOFING CONTRACTORS NEEDED IN MULTIPLE STATES!
Patton Services | (309) 303-3128 | rpatton55@comcast.net | http://www.whiteroofingsystems.com

Thursday, December 22, 2011

About Roof Construction and Maintenance

We've all heard people say that you have to spend money to make money; however, in today's uncertain economic times companies across the country aren't just looking to make money - they're tightening their belts, battening down the hatches, and looking for ways to save money. But even during hard times, it is important to remember that the old "spending" adage can still hold true for savings - sometimes you have to spend money to save money, especially with regard to a building's roof.

Although they are perhaps the least visible portion of buildings, roofs can account for up to 50% of a building's total surface area, and they can represent up to 25% of total building value. By proactively investing resources in building and maintaining a solid roof, building owners may extend the lives of their 15-year roofs to 25-year roofs by heading off leaks and other adverse conditions, which translates into significant long-term cost savings.

Preventive investment in the life of a roof happens in two primary areas: during the construction process of a new building, or as preventive maintenance for an existing roof. The goal of each is to extend the life or primary envelope function of the roof, but the different stages require two different types of oversight.

New Construction
Like any area of construction, roofs require unique expertise to maximize their effectiveness. Having an expert involved during the building's design all the way through construction, can ensure that the roof is designed, engineered, fabricated, and assembled to provide the building and its contents with watertight protection.

The optimal time to get a roof expert involved in the construction of a building is during the design phase, while the architectural team is still working on its detailed plans. A pre-design meeting between the owner/developer, architect, and roofing expert can help highlight issues that architects may need to address in the design - especially issues that may be unique to a particular climate.

An architect designing in South Florida, for example, will need to plan for stronger attachment of all roof components due to calculated uplift pressure requirements outlined in hurricane-related building codes. In northern climates, though, considerations must be made for snow weight and removal, ice dams, and the expansion and contraction associated with building materials in extreme climates. In either situation, it can be helpful for an architect to have a roofing expert available to alert him/her to potential issues before they arise.

As the design progresses, the roofing consultant should review architectural drawings and CSI Division 7 specifications related to waterproofing and roofing. The goal here is twofold: to ensure that the architectural team designs and specifies a roofing system that will adequately protect the building, and to ensure that the drawings and specifications are detailed and accurate enough for the general contractor to obtain accurate bids from roofing subcontractors. Accurate and detailed drawings at this stage can prevent the necessity of time-consuming architectural drawing changes and costly rebids or bid-change orders later in the building process.

In general, the roof expert will be looking at the design drawings and specifications for things like:
  • Membrane components and flashing. Are the appropriate membrane and flashing specified for the design, and do they reflect the specifications manual?
  • Detailed method of attachment. How the roof is attached is a major factor in its longevity and effectiveness. Do the design drawings provide adequate details and specifications relating to the geographical location?
  • Product compatibility. Just like any construction application, some products work together; some don't. For example, most silicone sealants can't be painted, and spray foam and asphalt products never go together. The consultant will assess compatibilities. Will the specified roof-system products that intersect with other subcontractor products (e.g. a glass and glazing curtainwall) work together?
  • Sequencing of installation. Roofing layers must be applied in a certain order, depending on the system, to maximize effectiveness. Do designs call for the right sequence?
  • Overall layout. Certain areas of a roof, such as those where HVAC units are located, will have higher foot traffic and maintenance-activity requirements. This should be accounted for in the roof design, with traffic and protection pads to protect the roof membrane and waterproofing materials. Is there enough protection in the right places?
Product Submittals
One common mistake in many projects is specification of the wrong type of fasteners. For example, roofing subcontractors for projects in coastal Florida may propose using galvanized screws to secure flashing; however, in Florida, the salt air will rust galvanized screws, so a roofing consultant would call out his or her recommendation to use stainless steel. It's a small detail, but it can have tremendous impact on the life of a roof and the necessity of future repairs.

After a roofing contractor has been selected, the contractor must submit full specifications for the system and all the components he/she intends to use. The roofing consultant should review these submittals to ensure that they coincide with the original specifications, and to be sure all details are appropriate for the system and the climate.

Pre-Installation Conference
Many of the various subcontractors involved in a building project will require roof access at some point to complete their portions of the building. Many may actually need to penetrate the roof to install pipes, vents, conduits, or machinery. To coordinate these efforts and ensure that they don't cause damage to the roof, a pre-installation conference should be a top priority.

At this meeting, the roof consultant will sit down with the architect, general contractor, roof manufacturer, and any subcontractors whose work may impact the roof to coordinate schedules and plans. This conference can also help determine where extra roof protection pads may be needed.

"Another issue we often address is the spacing and separation of all roof penetrations," says Jon B. Blehar, an architect in Lake Worth, FL. "We need to be sure that all pipes, vents, and conduits are spaced far enough apart that they leave enough room for the roofers to properly flash them. Lack of proper flashing can cause leaks and may affect the roof manufacturer's warranty."

Quality-Assurance Inspections
After all plans, submittals, and products are approved, and the actual work begins, quality-assurance inspections should be conducted at various points throughout the installation. The number of inspections varies from as few as two to as many as eight to 12, depending on the project. Four is a good guideline: one at the beginning to be sure everything is off to a good start, one in the middle as a progress check, one toward the end, and a punch-list inspection at the very end.

Common problems encountered in these inspections include everything from waterproofing seam failures to damaged flashing and debris left on the roof. See Roof Disarray, below, for an example of one project's inspection finds. The ultimate goal is a secure building envelope and a watertight roof that's in accordance with required codes and specifications.

Preventive Maintenance: Roof Asset Management
All roofs have a limited lifespan and will eventually require replacement, retrofit, repair, or restoration. Whether a roofing consultant was involved in the construction of the building or not, developing a preventive maintenance plan can further extend the life of a roof and save money by correcting problems before they become major leaks that could cause structural damage. Over time, a roof asset management program can optimize roof performance, save money, and allow for roof replacement or repairs on a planned basis - not in reaction to a crisis.

If a roof is new and has been inspected by a roofing consultant throughout construction, the final inspection report should provide enough information to establish a maintenance plan and inspection timetable.

For an existing roof, a consultant should thoroughly inspect the roof and provide a written report of findings with a photo survey of roof conditions for future reference. Based on those findings, the consultant will develop projected life-cycle budget cost estimates and establish plans for upcoming maintenance, replacement, or repair.

From this point, a good roof-management program should include annual inspections for an inspector to look for damage, including membrane deterioration, water blisters, ponding water, coping impact damage, rusting metal, spray foam oxidation, and membrane split.

If the roof shows signs of deterioration, the consultant may recommend moisture testing, such as:
  • Moisture probes, which are used to check distressed areas for the presence of moisture by probing through the roof surface and taking readings from the moisture meter.
  • Infrared scans, which are infrared snapshots of a roof area taken to detect the possible presence of moisture by recording temperature differentials.
  • Nuclear scans, which utilize a roof grid survey to detect subsurface moisture.Roof cores, where an investigative hole is cut through the roof and insulation to document conditions in suspect areas. This hole is patched upon completion.
Ultimately, the goal of both new construction roofing review and ongoing roof-management programs is to protect the interest of building owners, extend the life of the roof, and prevent costly leaks and damage. In today's business climate, many building owners and businesses are understandably looking for ways to cut costs; however, involving a roofing consultant in construction or an ongoing maintenance program will end up saving you more than you spend.

Find a Contractor here

ROOFING CONTRACTORS NEEDED IN MULTIPLE STATES!
Patton Services | (309) 303-3128 | rpatton55@comcast.net | http://www.whiteroofingsystems.com

Monday, August 29, 2011

Deferring Maintenance Brings Risks for Commercial Properties

It’s been more than 20 years since APPA published The Decaying American Campus: A Ticking Time Bomb. That report estimated that $60 billion in deferred maintenance existed on U.S. college campuses (which is more than $100 billion in today's dollars). Since then, APPA says there has been significant  progress but much remains to be done.

The problem of deferred maintenance is most often associated with institutional buildings since schools, hospitals and government bodies typically can’t just walk away from buildings, put them on the market to get what they can and leave someone else with the problem of upgrading those properties.

But government institutions aren’t the only organizations at risk. Take a look at this roofing article, where Karen Warseck describes a warehouse owner who put off a roof recover because the property didn’t have a tenant. Well, it has a tenant now and it also needs a new deck along with a new roof because leaks caused the old steel deck to rust through.

Deferred maintenance is insidious. No one decides to ruin a roof deck or let boilers go without maintenance for so long that they have to be replaced years before they should have needed replacement. But with the number of distressed assets in the commercial property market today and the pressure on facility budgets in all sorts of organizations, it’s easy to believe that a lot of needed infrastructure work is being deferred.

We strongly encourage commercial building owners and facility & property managers to ensure that basic routine roof cleaning and maintenance is done annually by a professional roofing contractor to avoid having to completely replace a roof years before it should have been. You will save a lot more money in the long-run (and basic cleaning and maintenance isn't that expensive - under 5 cents per square foot).

Find A Contractor


Tired of labor problems and low profit margins?
Make more $$ spraying coatings with Conklin Roofing Systems!
Patton Services
| (309) 303-3128 |
rpatton55@comcast.net | http://www.whiteroofingsystems.com